|
Athabasca
Joint Venture Drilling Progress
Pitchstone
Exploration Ltd. (TSX-V: PXP; “Pitchstone”) is pleased to provide an
update on drilling progress in the eastern Athabasca Basin,
Saskatchewan on its 50:50 joint venture properties with Uranium One
Inc. (TSX: UUU).
Two New Zones
Identified at Darby
95D Conductor
Hole DB-27
intersected a 1.3 meter core length, from 535.8 to 537.1 meters, that
contains 0.04% U3O8, including 0.3 meter
averaging 0.12% U3O8. This mineralization is
located along the east-west oriented 95D conductor and is
approximately 9 km west of the Cigar Lake deposit. No other drilling
on strike in proximity to DB-27 has been done.
Drill hole DB-27
intersected the Athabasca Group unconformity at a core length of 520.3
meters. The mineralized interval is within sheared, graphitic,
pyritic, pelitic basement rocks underlying Athabasca sandstone.
Pitchstone is further encouraged by the presence of anomalous uranium
and uranium pathfinder element values in the sandstone immediately
above the unconformity.
95B Conductor
Drill hole DB-31,
located along the 95B conductor in the southeast portion of Darby,
encountered anomalous radioactivity up to 1,000 cps (measured with a
hand-held S.R.A.T. SPP2 scintillometer) in a 0.3 meter long interval
of fracturing and alteration 35 meters beneath the unconformity.
Geochemical results to verify the presence of uranium are pending.
2008 Drilling
Progress
Diamond drilling
production continues to be very good with a total of 6,354 meters
completed in 10 drill holes during the summer drilling campaign.
Drilling on the joint venture properties in 2008 now totals 12,141
meters in 20 holes.
Follow up drilling
on the Candle property 97G zone (25% JCU (Canada) Exploration Company,
Limited (“JCU”)) during the summer program has not extended the zone
of mineralization intersected in the January-March 2008 drilling
campaign (a 0.5 meter core length in CD-25 from 655.3 to 655.8 meters
averaged 1.91% U3O8 including 0.2 meter that
contained 4.18% U3O8 – News Release 08.57, May
21, 2008). During the summer program, two holes were drilled north of
CD-25 and one was drilled east of CD-25. No significant radioactivity
was encountered in these holes; geochemical analyses are pending.
Further drill testing of the target will be required after an
interpretation of the alteration patterns, structural features and
geochemical results has been completed.
Moon
Lake Drilling
The 4,590 hectare
Moon Lake property is located one kilometer east of the Millennium
deposit (Indicated Mineral Resource of 46.8 million lbs U3O8),
which is currently being developed by Cameco Corporation, JCU and
AREVA. Only one hole has ever been drilled on the Moon Lake
property. A drill is currently being mobilized and a total of 1,400
meters in two holes is planned.
Steve Blower,
P.Geo., President of Pitchstone, is the Qualified Person for the
purposes of NI 43-101 with respect to the technical information in
this news release. Sample preparation and analyses were done by SRC
Geoanalytical Laboratories, Saskatoon. A partial digestion with
fluorimetric analysis was used for initial uranium determinations and
all samples containing greater than 100 ppm uranium were re-analyzed
with ICP. Pitchstone utilizes internally and externally submitted
standard reference materials for quality assurance and quality control
of the sample preparation and analyses.
About Pitchstone
Pitchstone is
actively exploring for uranium in four proven districts. The property
portfolio
features ten
projects in the eastern Athabasca Basin, Saskatchewan, five of which
are joint ventured with Uranium One Inc. and five are 100% owned. In
addition, there are four joint venture projects with Triex Minerals in
the Hornby Bay Basin, Nunavut, an exploration partnership with Cameco
and Motapa Diamonds in the Franceville Basin, Gabon, and an option on
three projects in Namibia. Pitchstone has a unique group of
geologists with extensive uranium exploration and production
experience. Pitchstone has approximately $9 million in cash and no
debt.
On behalf of the
Board,
E.A.G. (Ted)
Trueman, CEO and Director
For further information contact Jag
Sandhu at 604 306 1950, or visit www.pitchstone.net
The TSX Venture Exchange has not
reviewed and does not accept responsibility for the adequacy or
accuracy of this release. This news release may contain assumptions,
estimates, and other forward-looking statements regarding future
events. Such forward-looking statements involve inherent risks and
uncertainties and are subject to factors, many of which are beyond
Pitchstone’s control, that may cause actual results or performance to
differ materially from those currently anticipated in such statements.
|